tether
    Tether (USDT) $ 1.00
    ethereum
    Ethereum (ETH) $ 2,242.11
    xrp
    XRP (XRP) $ 1.35
    usd-coin
    USDC (USDC) $ 0.999948
    solana
    Solana (SOL) $ 84.26
    bitcoin
    Bitcoin (BTC) $ 72,871.00